Sep 4, 2021 · The power supply of the aqua feed plant project comes from the grid of the local power supply bureau, and the 10KV is introduced into the power distribution room of the big capacity 15t/h aqua feed plant after being transformed. The annual electricity consumption of this project is 15.65 million kWh, which can meet the demand.